The Teaching Factory (TEFA) building was inaugurated by the Chancellor, Prof. Dr. Yos Johan Utama, on Friday, April 26, 2024, at Undip Vocational School. The inauguration was attended by the Dean of the Vocational School, Prof. Dr. Budiyono, the Chair of the Academy Senate, Prof. Edy Rianto, Ph. heads of study programs, lecturers, education personnel, and Undip Vocational School students. In addition, we extended an invitation to company delegations that have been instrumental in connecting graduates with industry requirements and the practical products available on campus.The construction of the Tefa building cost IDR 20.1 billion, according to Dr. Ir. Agung Dwiyanto, M.T., the Chair of the Committee and Commitment Making Officer (PPK) for the Construction of the Undip Tefa SV Building. Contains a five-story laboratory structure and a one-story workshop. Construction will occur from July 2023 to January 2024 on an area of approximately 2,200 square meters. This building will serve as an auxiliary facility that can facilitate an optimal lecture environment. The construction of the new building will undoubtedly satisfy the specifications for multi-story buildings, laboratory facilities, and supporting facilities for student and lecturer lectures.
PT Sinar Mas previously awarded the Undip Vocational School a grant for the construction of exceptional facilities several years ago. Chancellor Yos Johan Utama also inaugurated this facility. Currently, the emphasis on educating students to be extremely competitive is the highest crown of Undip, according to Dean Budiyono. Upon their graduation from college, they must be promptly integrated into the labor market. Nevertheless, the primary objective is to obtain the crown. The response is that students are encouraged to engage with the business and industrial sectors throughout their academic careers. They are developed through a project-based learning (PBL) educational system.
This also assists Undip in the preparation of qualified graduates who are swiftly integrated into the job market. Conversely, Budiyono disclosed to the press on Tuesday, April 30, 2024, that all procurement and supplementary facilities at SV are associated with the PBL program. “This includes the new construction of the Tefa building, which has been directly supported by numerous companies.” This facility will be accessible to all students in the future to facilitate the production of numerous products that are both precise and acceptable to industry. Additionally, SV operates a digital marketing program/marketplace under the domain name vokamart.com. Chancellor Yos Johan expressed his gratitude for the innovative forms that SV has developed. He also stated that numerous buildings in this location were mute witnesses to the commencement of the construction of the Undip Campus in the Tembalang complex. Naturally, numerous structures and rooms are now quite antiquated. Nevertheless, contemporary structures are currently being constructed to provide lecture facilities that are both comfortable and enjoyable, as a result of the numerous accelerations and breakthroughs that have been developed.
Recent Comments